☰
Reference Manual
Toolpath Operations
Create Job Sheet
index.Aspire_Summary
×
index.Aspire_Summary
Job Setup Sheet
2-Sided_Machining_Getting_Started
Job Layout
Material Border
Material Setup
Job Type: Double Sided
Side of Material:Top
Flip Direction: Horizontal
Material Block:
(X):24" (Y):5.5" (Z):0.5"
Home / Start Position:
X:0" Y:0" Z:1.5"
Datum Position:
Z-Zero:Top of Material
XY: Bottom Left Corner
Clearance Z1: 0.3"
Toolpaths Summary
Toolpaths :
3
Horizontal Pockets
Vertical Pockets
Dowel Holes
Tool Name:
[1] End Mill (0.25 inch)
[1] End Mill (0.25 inch)
[1] Drill (0.250")
Time Estimate :
00:05:49
00:00:42
00:04:55
00:00:12
Toolpath: Horizontal Pockets
Toolpath Info
Time Estimate:
00:00:42
Toolpath Type: Pocket Toolpath
Feed Rate: 100 inch/min
Plunge Rate: 30 inch/min
Spindle Speed: 12000
Tool Info
Tool Name: End Mill (0.25 inch)
Tool Type: End Mill
Tool Number: 1
Max Cut Depth: 0.125"
Pass Depth: 0.125"
Stepover: 0.1"
Toolpath: Vertical Pockets
Toolpath Info
Time Estimate:
00:04:55
Toolpath Type: Pocket Toolpath
Feed Rate: 100 inch/min
Plunge Rate: 30 inch/min
Spindle Speed: 12000
Tool Info
Tool Name: End Mill (0.25 inch)
Tool Type: End Mill
Tool Number: 1
Max Cut Depth: 0.25"
Pass Depth: 0.125"
Stepover: 0.1"
Toolpath: Dowel Holes
Toolpath Info
Time Estimate:
00:00:12
Toolpath Type: Drilling Toolpath
Feed Rate: 3.123 inch/sec
Plunge Rate: 1 inch/sec
Spindle Speed: 12000
Tool Info
Tool Name: Drill (0.250")
Tool Type: Drill
Tool Number: 1
Max Cut Depth: 1"
Pass Depth: 0.25"
Stepover: 0.025"